Unofficial translation
In accordance with paragraph 4 of Article 74 of the Law of the Republic of Kazakhstan dated July 16, 2001 "On Architectural, Urban Planning and Construction Activities in the Republic of Kazakhstan" I hereby ORDER:
1. Approve:
1) the Rules for commissioning of the completed facility by the owner independently in accordance with Appendix 1 to this order;
2) the form of the facility commissioning certificate by the owner independently in accordance with Appendix 2 to this order.
2. The Committee on Construction and Housing-Communal Services of the Ministry for Investment and Development of the Republic of Kazakhstan shall:
1) ensure state registration of this order with the Ministry of Justice of the Republic of Kazakhstan;
2) within ten calendar days from the date of state registration of this order, send its copy on paper and electronic form both in the Kazakh and Russian languages to the Republican State Enterprise on the Right of Economic Management "Republican Center of Legal Information" for official publication and inclusion into the Reference Control Bank of Regulatory Legal Acts of the Republic of Kazakhstan;
3) within ten calendar days after the state registration of this order, send its copy for official publication in periodicals;
4) place this order on the Internet resource of the Ministry for Investment and Development of the Republic of Kazakhstan;
5) within ten working days after the state registration of this order with the Ministry of Justice of the Republic of Kazakhstan, submit the information on implementation of measures, to the Legal department of the Ministry for Investment and Development of the Republic of Kazakhstan, in accordance with subparagraphs 1), 2), 3) and 4) of this paragraph.
3. Control over execution of this order shall be entrusted to the supervising Vice-minister for Investment and Development of the Republic of Kazakhstan.
4. This order shall be enforced upon the expiry of ten calendar days after its first official publication.
Minister for Investment and Development of the Republic of Kazakhstan |
Zh. Kassymbek |
Appendix 1 to order No. 867 of the Minister for Investment and Development of the Republic of Kazakhstan dated December 13, 2017 |
Rules for commissioning of the completed facility by the owner independently
Chapter 1. General Provisions
1. These Rules for commissioning of the completed facility
by the owner independently (hereinafter - the Rules) are developed in accordance with the Law of the Republic of Kazakhstan dated July 16, 2001 "On Architectural, Urban Planning and Construction Activities in the Republic of Kazakhstan" (hereinafter - the Law) and shall determine the procedure for commissioning of the completed facility by the owner independently.
2. These rules shall apply to the facilities specified in paragraph 1 of Article 74 of the Law.
Chapter 2. The procedure for commissioning of the completed facility by the owner
independently
3. During acceptance of the constructed facility by the owner independently, the following shall be provided:
1) an architectural and planning assignment issued by the local executive body performing functions in the architecture and urban planning (with the exception of reconstruction (redesign, re-equipment) of premises (separate parts) of existing buildings unrelated to changes in bearing and enclosing structures, engineering systems and equipment and not providing for additional allotment (additional piece) of the land plot);
2) technical specifications (if necessary, connection, additional connection of the facility to the sources of engineering and public utilities and / or increase in loads);
3) design (sketch design) / technical design.
Footnote. Paragraph 3 - as amended by order No. 413 of the acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated 02.08.2021 (shall be enforced ten calendar days after the date of its first official publication).4. Upon completion of construction and installation work and after receiving a written notice from the contractor on the completion of the facility (if the facility was constructed by contracting), the owner shall proceed to the procedure for commissioning of the completed facility.
5. When accepting the constructed facility for operation, the owner shall:
1) accept the facility for operation with registration of the acceptance certificate of the constructed facility for operation by the owner independently in accordance with the form of Appendix 2 to this order (hereinafter - the certificate);
2) check compliance with the requirements of the design (sketch design) / technical design, issued source materials (documents) for the design of the facility and current regulatory and technical documents;
3) check compliance of the completed construction and installation works, used building materials (products, structures) and equipment with the design (sketch design) / technical design, as well as state (interstate) standards, if the construction of the facility was carried out by a contract method.
4) during the reconstruction (redesign, re-equipment) of the premises (separate parts) of existing buildings and structures unrelated to the change in bearing and enclosing structures, engineering systems and equipment, the commissioning certificate for the constructed facility shall be coordinated with the designer for compliance with the previously developed technical design.
Footnote. Paragraph 5 - as amended by order No. 413 of the acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated 02.08.2021 (shall be enforced ten calendar days after the date of its first official publication).6. The date of commissioning, adopted by the owner independently, shall be the date of signing the commissioning certificate.
7. The certificate shall be an exclusive source document when registering a property right to a constructed facility.
8. The certificate shall be subject to mandatory registering with local executive bodies, performing functions in the field of architecture and urban planning.
Appendix 2 to order No.867 of the Minister of Investment and Development of the Republic of Kazakhstan dated December 13, 2017 |
Footnote. Appendix 2 – as amended by order No. 413 of the acting Minister of Industry and Infrastructure Development of the Republic of Kazakhstan dated 02.08.2021 (shall be enforced ten calendar days after the date of its first official publication)..
Certificate of acceptance of constructed facility for operation by the owner independently
__________________________________ "____" ____________ 20__ year
(name of locality)
Facility owner
____________________________________________________________________
____________________________________________________________________,
(full name), residence address)
and contractor (if the facility was constructed by contract method)
____________________________________________________________________
____________________________________________________________________,
(name of the organization, full name,
position of the person, who performed construction, address, phone, license No., date of issue)
ESTABLISHED:
1. Construction of the facility/reconstruction (redevelopment, re-equipment)
of premises (separate parts) of existing buildings, unrelated to changes of
bearing and enclosing structures, engineering systems and equipment
___________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________,
(name of the facility, location and address)
_________________________________________________________________________
was carried out by the owner independently
__________________________________________________________________________
_________________________________________________________________________,
(full name)
and/or with engagement by him of the contractor
_________________________________________________________________________,
(name of the contractor organization, full name, position of the person)
2. Completed work:
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
(types of works)
3. The facility was constructed on the basis of:
_________________________________________________________________________
_________________________________________________________________________
(name of the body that issued the decision, No. and date of the resolution)
4. Construction/reconstruction (redesign, re-equipment) of premises
(separate parts) of existing buildings, unrelated to changes of bearing and
enclosing structures, engineering systems and equipment was performed according to the design (sketch design)
technical design, developed by
__________________________________________________________________________
__________________________________________________________________________
_________________________________________________________________________,
(name of the organization, full name), position of the person,
that developed the design (sketch design) / technical design). The design (sketch design) was coordinated with
__________________________________________________________________________
__________________________________________________________________________
(name of the organization that issued the letter of approval, No. and date)
5. Construction and installation works were carried out:
start of the works__________________________________________________________
(month and year)
end of the works ________________________________________________________,
(month and year)
6. The facility accepted for operation has technical characteristics in accordance with
application _____ to this certificate.
7. Measures to ensure explosion safety, fire safety, environment protection
__________________________________________________________________________
_________________________________________________________________________,
(execution details)
8. Basing on confirmed compliance of completed construction of the
facility/ reconstruction (redesign, re-equipment) of the premises (separate
parts) of existing buildings, unrelated to changes of bearing and enclosing
structures, engineering systems and equipment with state (interstate)
regulatory requirements, architectural-planning assignment, coordinated design
(sketch design) / technical design the owner decided to
ACCEPT for operation:________________________________________________
__________________________________________________________________________
_________________________________________________________________________,
(name of the facility)
9. I confirm compliance of the constructed facility with regulatory requirements, architectural and
planning assignment, design (sketch design) / technical design.
Owner of the facility______________________________________________________
__________________________________________________________________________
(full name), residence address, signature, date)
Contractor (if the facility was constructed on contract method)
_________________________________________________________________________.
(name of the organization, full name),
position, signature, date, seal (if any)
Design organization (in case of reconstruction (redesign, re-equipment)
of the building and structures (separate parts, premises), unrelated to changes of bearing and
enclosing structures, engineering systems and equipment)
__________________________________________________________________________
__________________________________________________________________________
(name of the organization, full name),
position, signature, date, seal)
Appendix 1 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (fish farming technological reservoirs (fish pond, fish pool) for fish farming (aquaculture) with a water surface area of one pond and (or) pool no more than 0.15 ha)
Fish pond
| Name of the fish pond (finishing, wintering, brood stock and other) | Pond dimensions | |||||
area | size (m3) | depth (m) | width(m) | length (m) | |||
maximal | average | ||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
1 | |||||||
2 | |||||||
3 |
table continuation
Land area allotted for the pond (ha) | Type of water supply (ground, underground sources) | Water supply method (by gravity, pumping stations, etc.) | Hydraulic structures | |
type of water supply system (channels, trunks, pipes, etc.) | type of spillway system (sluice, gateway etc.) | |||
9 | 10 | 11 | 12 | 13 |
Fish pond
| Name of the fish pond | Pond dimensions | Type of water supply (ground, underground sources) | ||||
size (m3) | Height, (m) | width(m) | diameter (m) (for round ponds) | length (m) | |||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
1 | |||||||
2 | |||||||
3 |
table continuation
Area of land plot allotted for the pond | Material used in construction (plastic, concrete, fiberglass, etc.) | Water supply method (closed water supply installation, by gravity, forcibly, etc.)) | Pool shape (round, rectangular, oval, square, etc.) |
9 | 10 | 11 | 12 |
table continuation
Type of pool (excavation, sunken, low-ground, etc.) | Hydraulic structures | |
type of water supply system (channels, trunks, pipes, etc.) | type of spillway system (overflow system, sluice, etc.) | |
13 | 14 | 15 |
Owner, (customer, developer )
__________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 2 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (individual residential building not higher than two floors; household buildings on the territory of individual household plots, as well as on plots of gardening and horticultural partnerships (societies); temporary buildings of residential and (or) household premises for seasonal work and distant pasture husbandry; buildings or structures for temporary, seasonal or auxiliary purposes (warehouses and storage facilities (span up to 6 m, height up to 7 m and area up to 2000 m² inclusive)
Name of the facility (main building, extensions, outbuildings, etc.) | Measurement unit | General information | ||||||
number of storeys (floor) | Built-up area (m²) | volume of the building (м³) | number of habitable rooms | total area (m²) | living space (m²) | height (m) | ||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
table continuation
Description of construction elements |
Type | |||||
foundation |
walls/ | roof | framing | floors | finishing | |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
table continuation
Amenities | ||||
power supply | water supply | hot water supply | sewage system | gas supply |
17 | 18 | 19 | 20 | 21 |
Layout of the facility
Scale ________
Explication to the facility layout
Floor | Number of the building | Purpose of the premises | Internal measurement area (m²), including | |
general | useful | |||
1 | 2 | 3 | 4 | 5 |
Explication of the land plot
Total area (m²) | Including (m²) |
Cost of main stock, accepted for operation | |||||
developed | Courtyard covering | Landscape garden | Vegetable garden | ||||
asphalt covering | pavements | soil | |||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Layout of the land plot
Scale ________
Owner, (customer, developer )
_________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 3 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (mobile complexes of container, block and modular design, as well as one-story buildings (structures) for trade, public catering and consumer services, built from prefabricated structures; detached one-story buildings (structures) for accommodating individual entrepreneurship objects of the total area under 20 m²; garages with boxes for no more than two cars; prefabricated buildings and structures of no more than two floors, which are not technically sophisticated (during emergency situations))
Name of the facility (main, annex) | General information | ||||||
number of storeys (floor) | number of premises, rooms | built-up area (m²) | building volume (m³) | total area (m²) | useful area (m²) | parking space area (m²) | |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
table continuation
Description of construction elements | Type of heating | |||||
foundation |
walls/ | roof | framing | floors | Finishing | |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
table continuation
Amenities | ||||
power supply | water supply | hot water supply | sewage | gas supply |
16 | 17 | 18 | 19 | 20 |
List of documents, attached to technical specifications of the facility:
1. Floor plans______________________________________________
2. Explication to floor layouts________________________________
Explication to the facility layout
Floor | Number of the building | Purpose of the premises | Internal measurement area (m²), including | |
general | useful | |||
1 | 2 | 3 | 4 | 5 |
Explication of the land plot
Total area of the land plot (m²) | Developed area (m²) | Undeveloped area (m²) | ||||
total | under main buildings | under other buildings and structures | asphalt covering | soil | other | |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
table continuation
Green spaces (m²) | ||
Lawn with trees | Lawns, flowerbeds | Other |
8 | 9 | 10 |
Owner, (customer, developer) ________________________________________________
(full name, signature)
Seal (if any)
Appendix 4 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (reconstruction (re-design, re-equipment) of residential and non-residential premises in residential houses (residential buildings), not requiring allocation of an additional land plot (addition to the territory), unrelated to any changes in bearing structures, engineering systems and communications, redevelopment ( re-equipment) of premises for non-industrial purposes, carried out in existing buildings and not requiring changes in bearing structures) (multi-apartment residential buildings, industrial, commercial facilities, etc.)
Name of the facility | General information | ||||||||
number of storeys (floors) | number of flats | number of premises, rooms | built-up area (m²) | building volume (m³) | total area (m²) | dwelling space (m²) | area of non-residential premises(m²) | area of balcony, loggia (m²) | |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
table continuation
Description of construction elements | Type of heating | ||||
foundation |
walls/ | roof | |||
11 | 12 | 13 | 14 | ||
Amenities | |||||
power supply | water supply | hot water supply | sewage | gas supply | |
15 | 16 | 17 | 18 | 19 | |
List of documents, attached to technical specifications of the facility:
1. Layouts ____________________________________________
Explication to the facility layout
Floor | Number of the building, rooms | Numbers of parts of the building, room | Purpose of parts of the building, room | Internal measurement area (m²), including | |||
Total | useful | dwelling | non-residential | ||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Owner, (customer, developer)
__________________________________________________________________________
(full name, signature)
Seal (if any)
Design contractor organization
__________________________________________________________________________
(name of the organization, full name, position,
signature, date)
Seal (if any)
Appendix 5 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (power supply networks with an installed capacity of up to 200 kilowatts for business entities)
No. | Name | Measurement unit | Amount |
1 | Low voltage overhead lines … | kilometer (further – km) | |
2 | Low voltage cable power lines … | km | |
3 | Supports area | m² | |
4 | Supports: | ||
1) metal | pieces(further – pcs) | ||
2) wooden with wooden attachments | pcs | ||
3) wooden with reinforced concrete attachments | pcs | ||
4) reinforced concrete | pcs | ||
5) cable hangers | pcs | ||
5 | Wires: | ||
1) copper | km | ||
2) aluminum | km | ||
3) steel- aluminum | km | ||
6 | Torch brackets: | ||
1) reinforced concrete | pcs | ||
2) metal | pcs | ||
7 | Street lighting fittings: | ||
1) torches with incandescent lamps | pcs | ||
2) torches with mercury lamps | pcs | ||
3) torches with fluorescent lamps | pcs | ||
8 | Cables: | ||
1) brands…….voltage... | km | ||
2) brands........ voltage... | km | ||
9 | Connecting couplings... | pcs | |
10 | End couplings | pcs | |
11 | Ground loops | pcs | |
12 | Lightning protection devices | pcs | |
13 | Road surfaces of cable networks: | ||
1) asphalt concrete | m² | ||
2) cobblestones | m² | ||
3) sidewalks | m² |
Owner, (customer, developer)
__________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 6 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (water and sanitation networks, etc., protection of engineering networks from electrocorrosion)
No. | Name | Measurement units | Number, length | Note | |
Water pipeline | |||||
1 | Water conduits (total length) | m | |||
1) made of steel pipes | m | ||||
2) made of cast iron pipes | m | ||||
3) made of asbestos-cement pipes | m | ||||
4) made of reinforced concrete pipes | m | ||||
2 | Distribution network (total length) | m | |||
1) made of steel pipes | m | ||||
2) made of cast iron pipes | m | ||||
3) made of asbestos-cement pipes | m | ||||
4) made of polyethylene pipes | m | ||||
3 | Other devices | ||||
Inspection well | pcs | ||||
Gate valve,d- | pcs | ||||
d- | pcs | ||||
d- | pcs | ||||
Valves, d- | pcs | ||||
d- | pcs | ||||
d- | pcs | ||||
Faucet, d- | pcs | ||||
d- | pcs | ||||
d- | pcs | ||||
Hydrant | pcs | ||||
Plumbing inlet | pcs | ||||
Water column | pcs | ||||
Steel case | pcs | ||||
Drinking fountain | pcs | ||||
Sewage | |||||
1 | Collectors (total length) | m | |||
1) made of ceramic pipes | m | ||||
2) made of cast iron pipes | m | ||||
3) made of concrete pipes | m | ||||
4) made of asbestos-cement pipes | m | ||||
5) made of reinforced concrete pipes | m | ||||
2 | Sewer network (total length) | m | |||
1) made of ceramic pipes | m | ||||
2) made of cast iron pipes | m | ||||
3) made of concrete pipes | m | ||||
4) made of asbestos-cement pipes | m | ||||
5) made of reinforced concrete pipes | m | ||||
3 | Other devices | ||||
Inspection well | pcs | ||||
Release | pcs | ||||
Horizontal section of the well | Vertical section of the well | ||||
Scale ______ | Scale ______ |
Specification
No. | Name | Brand | Material | Diameter (dimensions) (mm) | Amount | Note |
Scheme of linking the well to permanent reference points
Owner, (customer, developer )
_______________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 7 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (in-site networks and in-house gas supply systems for household purposes of individual residential buildings)
No. | Name | Measurement units | Number, length | Note |
1 | Length of the pipeline | m | ||
Length of air routing: | m | |||
1) on overpasses | m | |||
2) on supports | m | |||
3) unsupported laying | m | |||
Number of supports | pcs | |||
Length of underground laying: | m | |||
1) in passing channels | m | |||
2) in semi- passing channels | m | |||
3) channel-free laying | m | |||
2 | Number of wells (chambers) | pcs | ||
3 | Number of compensators | pcs | ||
4 | Number of inlets | pcs | ||
5 | Number of valves d- | pcs | ||
d- | pcs | |||
6 | Valves (flap) d- | pcs | ||
d- | pcs | |||
7 | Straight-through valve d- | pcs | ||
d- | pcs | |||
8 | Siphons (hydraulic valves) | pcs | ||
9 | Adapters | pcs | ||
10 | Rotary valves | pcs | ||
11 | Pressure regulators | pcs | ||
12 | Wells | pcs | ||
13 | Pumping units (type ______ , brand ____ ) | pcs | ||
-//- (type ____, brand ____) | pcs | |||
-//- (type ____, brand ____) | pcs | |||
Horizontal section of the well | Vertical section of the well | |||
Scale______ | Scale ______ |
Specification
No. | Name | Brand | Material | Diameter (dimensions) (mm) | Number | Note |
Scheme of linking the well to constant reference points
Owner, (customer, developer)
_________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 8 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (in-site communication lines)
No. | Name | Measurement units | Number, length | |
1 | Air communication lines, including: | km | ||
1) brand | km | |||
2) brand | km | |||
3) brand | km | |||
2 | Cable communication lines, including: | km | ||
1) brand | km | |||
2) brand | km | |||
3) brand | km | |||
3 | Supports, including: | pcs | ||
1) metal | pcs | |||
2) wooden | pcs | |||
3) anchor | pcs | |||
4) reinforced concrete | pcs | |||
5) cable hangers | pcs | |||
4 | Network wells, including: | pcs | ||
1) CCW 1 (communication cable well) | pcs | |||
2) CCW 2 | pcs | |||
3) CCW 3 | pcs | |||
4) CCW 4 | pcs | |||
5) CCW 5 | pcs | |||
5 | Couplings | pcs | ||
6 | Communication collectors, including: | |||
1) ceramic | km | |||
2) concrete | km | |||
3) asbestos-cement | km | |||
4) plastic | km | |||
7 | Unattended amplifying points(further – UAP) | pcs | ||
8 | Other devices | |||
Horizontal section of the well | Vertical section of the well | |||
Scale ______ | Scale ______ | |||
Specification
No. | Name | Brand | Material | Diameter (dimensions) (mm) | Number | Note |
Horizontal section of UAP | Vertical section of UAP | |||||
Scale ______ | Scale ______ | |||||
Specification
No. | Name | Brand | Measurement units | Material | Quantity (dimensions) | Note |
Scheme of linking cable communication wells and UAP to fixed reference points
Owner, (customer, developer)
__________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 9 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (small architectural forms and fencing of territories; open sports grounds, sidewalks, paving around buildings (structures); open-type parking lots for not more than fifty cars)
Name of the facility | General information | ||
Built-up area (m²) | dimensions (m) | other | |
1 | 2 | 3 | 4 |
Table continuation
Description of construction elements | Amenities | ||||
foundation | walls | covering | power supply | water supply | sewage |
5 | 6 | 7 | 8 | 9 | 10 |
Owner, (customer, developer)
__________________________________________________________________________
(full name, signature)
Seal (if any)
Appendix 10 to certificate of acceptance of constructed facility for operation by the owner independently |
Technical specifications of the facility (systems of automatic security and fire alarms inside administrative and amenity and industrial buildings)
No. | Name | Measurement unit | Quantity |
1 | wire | m | |
2 | detector | pcs | |
3 | sensor | pcs | |
4 | Installation of alerting system | ||
light | pcs | ||
sound | pcs | ||
5 | Uninterruptible power supply units | pcs | |
6 | Accumulator batteriesи | pcs | |
7 | Receipt and control device | ||
Indicator board | pcs |
Owner, (customer, developer)
__________________________________________________________________________
(full name, signature)
Seal (if any)